|
An overall floor depth of only 320mm. USFB with SD225 deck sat on the bottom flange, and concrete within the depth of the beam.
Fabricator: Hayes Engineering Engineer: Faber Maunsell Span: 7.2m Beam: 320mm x 216.5kg/m USFB
The onerous floor loading of 7.5kN/m2 + heavy point load, led the engineer to consider concrete. However, the USFB met every criteria for depth, cost and lead-time.
|