To Westok Home Page
Doncaster Racecourse


Doncaster Racecourse

Cantilever span of 16.1 metre with a back span of 12.0 metre, the centres of the beams were 5.0 metre.

Fabricator: Billington Structures Ltd
Engineer: TRP Consulting
Span: Cantilever 16.1 metre
Beam: 864 to 500 deep tapered cellular beam cut from a 838 x 292 x 194 UB section

24.0 metre long 1022 x 267 x 197 cellular beams were also supplied to the exhibition hall.

 

See also: Tapered Roof Technolgy

Home Contact Us Site Map Terms of Use Privacy Policy Update Policy © Westok 2008