To Westok Home Page
Waters Meeting Health Centre, Bolton


Health Centre Bolton

Type 1:USFB
Fabricator: BD Structures Ltd
Engineer: Rutter Johnson
Span: 9 Metres
Beam: USFBs ranging from 280mm to 335mm deep. Mass ranged from 107kg/m to 238kg/m.
Description: The USFBs were designed with in-situ concrete on 225mm deep metal deck.
The USFBs had a minimum flange asymmetry of 100mm to land the decking.

To View Erection and Concreting Sequence of USFB'S CLICK HERE

 

See also: USFB Technolgy

Home Contact Us Site Map Terms of Use Privacy Policy Update Policy © Westok 2008